As part of its New Studios development, Sky Studios needed a complete heating and cooling solution for seven new build office spaces spread across three floors. Going up against the market on a competitive tender, Zircon Building Services secured the project on technical strength and price — and delivered the full Daikin VRV IV heat recovery installation on time and on budget.
As part of its New Studios development, Sky Studios was bringing forward seven brand new office spaces spread over three floors to house the teams supporting the wider production facility. The brief to the market was clear: deliver a high-performance heating and cooling solution that would tie all seven offices together on a single, well-engineered platform — flexible enough to handle differing loads floor by floor and room by room, and robust enough for long-term commercial use.
The project was put out to competitive tender, with bidders judged on technical approach, programme certainty and commercial value. Zircon Building Services was successful, securing the £2.2m contract to design, install and commission the air conditioning system across all seven offices.
Zircon specified a Daikin VRV IV heat recovery (3-pipe) platform — the ideal fit for a multi-floor office estate where one space may be calling for cooling while the office next door, or the floor above, needs heat. Energy that would otherwise be rejected outside is moved between zones, which is both more efficient and more comfortable for the people using the building.
VRV IV combines variable refrigerant flow with Daikin's VRT smart control, so the system continuously self-tunes to the real load in each space. Indoor units across all seven offices and three floors operate independently — staff set their own temperature in their own room without affecting anyone else.
For a new build of this profile, VRV IV gives the client modern, low-noise comfort cooling and heating from a single, well-supported platform with a long, predictable service life.
Working alongside the principal contractor and design team from early in the New Studios programme, Zircon's engineers carried out heat-load calculations office-by-office and floor-by-floor, sized the VRV system to match real demand and coordinated services routes with the wider M&E package — keeping the system properly engineered, not over-specified.
On site, our installation team handled the full scope across all three floors: indoor units positioned for comfort and acoustics in each office, refrigerant pipework, condensate drainage, electrical first and second fix, controls integration, commissioning and a clean handover into the client's facilities team.
Every office runs to its own setpoint on every floor. Heating and cooling can happen at the same time across the building, so each space gets exactly the conditions its occupants need without compromising on energy use.
The full £2.2m installation was delivered to the agreed programme and within the agreed cost — a key requirement on a new build with a fixed handover date and a busy wider construction programme.
A single Daikin VRV IV system ties all seven offices together — easier for the in-house team to operate, monitor and maintain over the long term than a patchwork of standalone units.