Case Study · Education Sector

Smart Cloud Boiler Control turns off the gas when nobody's there.

A Scottish primary school cut gas waste during evenings, weekends and holidays — without a single change to the existing boiler plant. The result: instant, measurable savings and a clear path to net-zero reporting.

£35,000
Year 1 saving
£5,850
Saved in first 6 weeks
£175k
5-year projected saving
2 hrs
From install to first saving

The Challenge

Like most Scottish primary schools, the building runs to the school bell — but the boiler doesn't. A traditional time-clock and thermostat setup kept the plant firing through evenings, weekends, in-service days and the long summer holiday, heating empty classrooms at full tilt.

The estates team suspected gas was being burned needlessly, but had no visibility. The legacy controls produced no usable data, no alerts and no way to prove waste to the finance team or to local authority sustainability leads. Replacing the BMS would have meant a six-figure capital upgrade the school couldn't justify.

What was needed was a low-disruption, low-cost layer that could sit on top of the existing plant, expose what the boiler was actually doing, and quietly switch it off whenever it shouldn't be on.

The Solution

Zircon's engineers carried out a survey, fitted the Smart Boiler Optimiser alongside the existing boiler control panel, and deployed wireless LoRaWAN sensors across the building — measuring classroom temperature and humidity, flow and return temperatures, and current draw on the plant itself. A LoRaWAN gateway streams the data to the Zircon Smart Platform in the cloud.

The optimiser learns when the school is genuinely occupied and when it isn't. It complements the existing controls rather than replacing them — the school keeps everything it already had, and gains a thin, intelligent layer that decides when the boiler actually needs to fire. A simple Optimise / Bypass selector on the panel hands manual control back to the caretaker in seconds if ever needed.

From day one, the estates team and the local authority's energy lead get a single dashboard showing live gas use, accumulated savings in pounds and pence, carbon avoided, and alerts the moment something looks wrong — frost risk, sensor drift, or a boiler running when the building is empty.

The Results

£5,850
Saved in the first 6 weeks of operation, visible on the dashboard from day one.
£35,000
Gas saving in Year 1 — driven almost entirely by stopping out-of-hours heating during evenings, weekends and holidays.
£175,000
Projected saving over 5 years, alongside a substantial reduction in CO₂e emissions reported automatically.

Year 1 savings are based on heating that was previously operating during weekends, holidays and after school hours, and have been validated against half-hourly gas-meter data on the Zircon Smart Platform.

What was installed

Smart Boiler Optimiser Kit
Control panel with 2x external T/H sensors for frost protection.
10x Classroom Sensors
Wireless AM102L temperature & humidity sensors for occupied-zone monitoring.
Boiler Probes
2x EM500-PT100 probes on flow and return for live efficiency tracking.
LoRaWAN Gateway
Long-range, low-power wireless backhaul — no IT integration required.
Zircon Smart Platform
Cloud dashboard with live energy, cost and carbon savings — first year included.
Survey, Install & Reporting
Full professional setup, year-one maintenance, and 12 monthly reports for ESG and finance.

One school today. A whole estate tomorrow.

The same platform that runs this single school scales seamlessly to a multi-site portfolio. Local authorities and Multi-Academy Trusts get a single pane of glass across every boiler, every building — pounds saved, kWh avoided, carbon reduced — supporting NetZero, ESG and statutory reporting commitments.

£8.7M
Projected portfolio saving
across 50 schools / 5 years

Could your school or estate be next?

Book a free site survey and we'll show you exactly where your gas is going — and how much you could save in the first year.

Talk to Zircon Smart Buildings →