Client Case Study · Smart Manufacturing

Turning the lights on inside the factory: machine-level energy & IAQ visibility for a UK Tier-1 advanced manufacturer

How a phased LoRaWAN submetering programme delivered live consumption and air-quality data across an entire production estate — laying the foundation for ISO 50001, ESOS Phase 4 and a credible Net-Zero roadmap.

Sector · Aerospace, Defence & Rail Fabrication Location · UK Programme · Energy + IAQ + Lighting Delivery · Phased POC → Full Rollout
Client Profile
UK Tier-1 precision metal fabrication & laser-cutting facility serving aerospace, defence and rail OEMs
Estate Scope
Full production hall coverage — heavy presses, fibre lasers, CNC machining, robotic weld cells, paint & finishing
Compliance Drivers
ISO 50001 implementation · ESOS Phase 4 · SECR & Net-Zero pathway
Delivery Partner
Zircon Smart Building — programme management, install, commissioning & bespoke visualisation

1The Challenge — A factory operating in the dark

Like most heavy-industry sites of its generation, the manufacturer had a single fiscal meter at the gate and a sizeable energy bill — but no meaningful visibility of where that energy was actually being consumed inside the building. Production teams suspected the laser cutters and large hydraulic presses dominated load, but suspicion is not a defensible answer to an ESOS auditor or a Tier-1 OEM customer asking for verified Scope 1&2 reporting.

Three pressures converged. ESOS Phase 4 was approaching, with mandatory recommendations now requiring an evidence base. ISO 50001 had become a stated business goal, demanding identification of Significant Energy Uses (SEUs) and a continuous-improvement loop. And several flagship customers had begun cascading carbon-intensity requirements down the supply chain — turning energy data into a commercial qualifier, not just a sustainability nice-to-have.

Compounding the energy gap, the site had no objective indoor air-quality data — a growing concern in welding, paint and finishing areas where HVAC effectiveness directly affects both compliance and workforce wellbeing.

We had a number on the bill and a hunch about which machines were the worst. What we didn't have was anything we could put in front of an auditor or a customer and call evidence. — Operations & Sustainability Lead (anonymised)

2The Approach — Prove it small, then scale it sensibly

Rather than commit capital to a full-estate rollout up-front, Zircon Smart Building structured the programme in three phases. The intent was simple: de-risk the technology and the data quality on a representative slice of the estate first, then scale once the operations team had built confidence in the platform and the workflows around it.

Phase 1

Proof of Concept

A small, deliberately diverse cohort of machines was instrumented — covering a high-energy laser cutter, a heavy hydraulic press, a CNC turning centre, a multi-CT robotic weld cell, a paint-booth HVAC line and a metrology bay. Six machines, seven metering points; enough to stress-test load profiles, signal coverage and platform behaviour without committing the full capex.

Phase 2

Full-Estate Rollout

Following POC sign-off, the deployment scaled to the complete machine inventory and added per-circuit lighting submetering across the site's distribution boards. A unified LoRaWAN backhaul carried machine energy, indoor air quality and lighting data over a single, low-disruption wireless layer — installed without rewiring or production downtime.

Phase 3

Live Platform & Bespoke Dashboards

A SaaS platform delivers the live and historical data, and a bespoke Zircon dashboard layer — aligned to the client's production lines, departments and ISO 50001 SEUs — provides operations, finance and sustainability teams with views tailored to how they actually run the business.

A small but important design decision: energy metering and indoor air-quality sensing were combined into a single panel per machine. One enclosure, one install visit, one wireless device, two compliance outcomes — a meaningful reduction in install cost and ongoing platform overhead compared with treating energy and IAQ as separate projects.

3Outcomes & Impact

✓
Significant Energy Uses identified. The site can now objectively rank its largest consumers and target intervention where it pays back fastest — a core ISO 50001 requirement.
✓
Energy attributable to production. Live machine data correlated with output volume turns kWh into a per-part cost — measurable, comparable, and conversation-ready with customers.
✓
Lighting brought into scope. Per-circuit lighting submetering closed a long-standing blind spot, separating production lighting from emergency lighting and small-power feeds.
✓
Idle & out-of-hours load exposed. Continuous monitoring surfaced consumption patterns that periodic spot-checks had been quietly missing for years.
✓
IAQ correlated with HVAC behaviour. CO₂, VOC, particulate and humidity readings in welding and paint areas validated — and in places challenged — the assumed performance of the existing ventilation strategy.
✓
An audit-ready evidence base. ESOS Phase 4, SECR and customer ESG questionnaires can now be answered from one dataset rather than reconstructed from invoices and assumptions.

4What we learned — Three takeaways for any manufacturer considering this

Visibility is the project. The savings come next.

The temptation is to skip straight to LED retrofits, VSDs and compressor upgrades. Without a baseline, none of those projects can be properly scoped or verified — and customer-side scrutiny is now sharp enough to notice.

Pilot first, but pilot a representative slice.

A POC made up only of similar machines proves nothing. Mixing duty types — lasers, presses, CNC, weld cells, HVAC — exposes the platform to the load diversity it will face at scale, and surfaces commissioning issues while they are still cheap to fix.

Energy and IAQ belong in the same enclosure.

Treating air quality and energy as separate programmes doubles the install effort and halves the strategic value. Co-locating sensors lets the same data infrastructure serve compliance, operations and people.